Refurbishment

As with a Formula 1 pit stop, the teams have to be ready, everything has to be planned down to the last detail. Thanks to its mastery of planning and technique, Stratebord prepares your complex interventions.

The technical shutdown of strategic equipment must be carried out in the shortest possible time, with the least possible disruption to operations. Meeting a short deadline is totally dependent on the quality of the preparation of the work.

EXAMPLES OF WORK CARRIED OUT

  • Crane base with a capacity of 1.5 tonne.

  • Weight container for anchoring a gantry in « storm » conditions

  • Clincker transport container.

  • Changing counterweights on a ship repair crane

  • Design of a tender for the adaptation and renovation of second-hand gantry cranes after transfer to a new port